Aura by Grovy

Aura by Grovy is set to redefine luxury living in the heart of Dubai’s Jumeirah Village Circle (JVC), promising a perfect blend of serenity and urban lifestyle. Slated for completion in the second quarter of 2024, this project stands as a testament to Grovy Real Estate Development LLC's commitment to luxury and high-end living. Aura will feature a range of studio, one, two, and three-bedroom apartments, each designed with an emphasis on sustainability and adherence to the Green Building Code.
Residents of Aura will be treated to an array of top-tier amenities designed for comfort, convenience, and a lavish lifestyle. The development will boast temperature-controlled swimming pools, a jogging track, multi-sport courts, a fully equipped gym, steam and sauna rooms, 24/7 security surveillance, smart home automation, and even a spa. For families, the children’s play area and communal gardens offer spaces for leisure and community engagement, while an electronic vehicle charging station and access-controlled entry points ensure modern conveniences and security.
The strategic location of Aura in JVC provides seamless connectivity to some of Dubai’s most iconic destinations, including the Dubai International Airport, Burj Khalifa, Palm Jumeirah, and Kite Beach, all within a 5 to 15-minute drive. This makes it an ideal choice for those who seek the vibrancy of city life alongside the tranquility of a residential community. Aura represents a holistic living experience, where every detail is meticulously crafted to offer residents a sophisticated and sustainable living environment.
The project’s design philosophy blends aesthetic appeal with functionality, ensuring that every aspect of Aura contributes to a luxurious and harmonious living experience. This development is not just a place to reside; it's a sanctuary where life’s best moments unfold, making it a prime investment opportunity for those seeking to experience the pinnacle of Dubai’s luxury real estate.
- 9 houses have been leased in
6 residential complexes since 2015 - 20 houses in progress in
7 housing complexes
- 2 houses have been built, not put into operation
- 8 houses are under construction
- 1 house in the project
- 1 house suspended